
£150m Aberdeen incinerator temporarily shuttered over structural faults
However, a growing number of faults at the site, which opened less than two years ago, has left Belgian operator Indaver on the brink of pulling out. Sources told trade journal EWB that the facility contained more than 1800 ‘snags’ when it was handed over …